    Candır Wind Power Plant Project, which belongs to Cekme Enerji Yatırım Uretim ve Ticaret A.S. operates under the name of RT ENERJI, is located near the Enez District of Edirne Province and has an installed power of 10 MW.

  • Capacity

    Candır WPP Project, which was put into operation in June 2021, has an annual electricity generation capacity of 35 million kWh with 3 turbines and an installed power of 10 MW. Candır WPP Project, which started production at full capacity with the installation of all turbines in December 2021, meets the annual electricity needs of approximately 11,312 people.

Project Details

Candır Wind Power Plant Project, which belongs to Cekim Enerji Yatırım Uretim ve Ticaret A.S. operates under the name of RT ENERJI is located near Enez District of Edirne Province and has an installed power of 10 MW. Candır WPP Project, which was put into operation in June 2021, has an annual electricity generation capacity of 35 million kWh with 3 turbines and an installed power of 10 MW. Candır WPP Project, which started production at full capacity with the installation of all turbines in December 2021, meets the annual electricity needs of approximately 11,312 people.

Candır Wind Power Plant works in an ecologically and socially sensitive manner and provides a reduction of approximately 15,000 tons of CO2 per year.

  • Location

    Enez / Edirne TURKEY

  • Project Year

    2021

  • Project Head

    RT ENERJİ