x
R T E N E R J I
For your thoughts and suggestions    Contact Form
//
Who we are

Empowering our future with Green energy

  • About Company

    Kirazlı Wind Power Plant Project, which belongs to Kiraz Energy Investment, Production, and Trade Inc. operates under the name of RT ENERJI, is located near the Kiraz and Nazilli Districts of İzmir and Aydın provinces, and has an installed power of 50 MW.

  • Capacity

    Kirazlı WPP Project, which was put into operation in December 2019, has an annual electricity generation capacity of 188 million kWh with 14 turbines and an installed power of 50 MW. The Kirazlı WPP Project, which started production at full capacity with the installation of all turbines in September 2020, meets the annual electricity needs of approximately 60,760 people.

Project Details

Kirazlı Wind Power Plant Project, which belongs to Kiraz Energy Investment Production and Trade Inc. operating under RT ENERJİ, is located near the Kiraz and Nazilli Districts of İzmir and Aydın provinces, and has an installed power of 50 MW. The Kirazlı WPP Project, which was put into operation in December 2019, has an annual electricity generation capacity of 188 million kWh with 14 turbines and an installed power of 50 MW. The Kirazlı WPP Project, which started production at full capacity with the installation of all turbines in September 2020, meets the annual electricity needs of approximately 60,760 people.

Kirazlı Wind Power Plant works in an ecologically and socially sensitive manner and provides approximately 75,000 tons of CO2 emission reduction per year.

  • Location

    Kiraz / İzmir ve Nazilli / Aydın TÜRKİYE

  • Project Year

    2021

  • Project Head

    RT ENERJI